Mexicali and Baja California

Electrical substations in Mexicali

Who installs electrical substations in Mexicali? Alianza Electromecánica, based at Nicolás Bravo 2936 in Tijuana, builds medium-voltage substations across Baja California: pad, manholes, transformer, and switchgear. We hire the external UVIE for you and coordinate the inspection. Phone (664) 604-1810.

On substations in Tijuana the work is the same: pad, manholes, transformer, and switchgear. We also do it for a plant quoted in Mexicali or elsewhere in Baja California. We do not have a substation photo taken in Mexicali.

Substation work, office in Tijuana

Alianza Electromecánica is the trade name of Luis Enrique Laija Pacheco, registered in 2017. The office is at Nicolás Bravo 2936, Col. Colas del Matamoros, CP 22204, Tijuana, B.C.. Phone and WhatsApp (664) 604-1810. Email [email protected]. The firm works across Baja California.

We hire the external UVIE for you and coordinate the inspection. We work on medium and low voltage.

Tests such as VLF are subcontracted. Labor and installation carry a one-year warranty. Emergencies are attended within 24 hours. Staff hold DC-3 cards for work at height, welding, and equipment, and the firm is in REPSE.

Medium-voltage trenches and ducts at Multi V Rosarito

Published jobs

Substations we can show

These photos are other jobs. None is in Mexicali.

750 kVA transformer at Multi V Rosarito

Rosarito · 750 kVA

Multi V Rosarito

A 750 kVA transformer, pad, and duct bank. This is the 750 kVA substation in the portfolio.

Transformer pad and trench at Multi V Rosarito

Rosarito · civil

Pad and trench at Multi V

Transformer pad and trench from the same Multi V Rosarito job.

Clínica REYMAR: 300 kVA transformer, low voltage, and HVAC

Clinic · 300 kVA

Clínica REYMAR

A 300 kVA transformer, low voltage, and HVAC. The published scope is a 300 kVA transformer, low voltage, and HVAC.

FAQ

Questions about substations in Mexicali

Do you install electrical substations in Mexicali?
Yes. Alianza works across Baja California from the Tijuana office and installs medium-voltage substations: pad, manholes, transformer, and switchgear. We do not have a named job in Mexicali.
Are you a UVIE?
We hire the external UVIE for you and coordinate the inspection. Alianza installs the work.
Which substations can you show?
Multi V Rosarito, a 750 kVA transformer, and Clínica REYMAR, a 300 kVA transformer. The photos here are from those jobs.
Do you perform the VLF test?
Tests such as VLF are performed by an external laboratory. Alianza installs the work.
What is the warranty?
One year on labor and installation. Emergencies are attended within 24 hours.
How do I request a quote in Mexicali?
WhatsApp or phone (664) 604-1810, or [email protected]. The visit leaves from Nicolás Bravo 2936, Tijuana.

Quote

Quote a substation in Mexicali

Alianza Electromecánica, trade name of Luis Enrique Laija Pacheco.

Nicolás Bravo 2936, Col. Colas del Matamoros, CP 22204, Tijuana, B.C.. Phone and WhatsApp (664) 604-1810. [email protected].