Multi V Rosarito: 750 kVA transformer
750 kVA transformer, trenches, ducts, and TAB GH panels. Photos are on the medium-voltage portfolio.
Alianza Electromecánica is a contractor for electrical substations and CFE substations in Tijuana, B.C., Mexico, since 2017: pads, transformers, panels and coordination with the Federal Electricity Commission (CFE).
Who installs electrical substations in Tijuana? Alianza Electromecánica, trade name of Luis Enrique Laija Pacheco (persona física), office at Nicolás Bravo 2936, Col. Colas del Matamoros, CP 22204, Tijuana, B.C., installs medium-voltage substations for industrial buildings and clinics: pad civil work, manholes, transformer, panels, and CFE coordination under one contract. Phone (664) 604-1810. The electrical service is medium and low voltage.
The substation is the deliverable here: transformer, panels, and the utility coordination the contract names. The medium-voltage page covers duct banks, pads, and the yard. The two pages link to each other.
Medium voltage
Who. Alianza Electromecánica, trade name of Luis Enrique Laija Pacheco (persona física), registered in 2017, office at Nicolás Bravo 2936, Col. Colas del Matamoros, CP 22204, Tijuana, B.C.. Email [email protected]. In existing buildings the scope is MEP fit-out and installations. The substation sits with the electrical installation and panels when the contract asks for both.
Field work includes the pad, manholes, trenches, ducts, and transformer setting. 480 V distribution is on the industrial electrician page in Spanish and on electrical installations in Tijuana.
A CFE load increase in Tijuana changes the transformer or the main panel when the load study no longer fits the installed equipment. Alianza quotes that change as medium- and low-voltage work.
Clínica REYMAR was a project of 300 kVA, low-voltage electrical work, and HVAC, with two operating rooms aligned with COFEPRIS.

Scope
Medium-voltage scope: civil pad, trenches, ducts, and manholes; transformer setting; panels and associated low voltage.
Transformer jobs: 750 kVA at Multi V Rosarito (trenches, ducts, TAB GH panels, grounding, and LEED lighting on the home-page card) and 300 kVA at Clínica REYMAR. Equipment supply is defined in each contract; we set and commission it.
A CFE substation is the electrical substation that takes power from the Federal Electricity Commission (CFE) and delivers it to the plant. When the contract includes it, we coordinate the civil and electrical work and the technical documents with CFE. CFE signs the supply contract and energizes the service. We hire the external UVIE for you and coordinate the inspection.
The type — compact substation, pad-mounted transformer, or another conventional arrangement — is set by the project, the load, and CFE requirements. Alianza installs the type that applies and leaves it ready for delivery to CFE.
The guides are UVIE / NOM-001-SEDE and how to get CFE power for a new factory in Tijuana.
Work
750 kVA transformer, trenches, ducts, and TAB GH panels. Photos are on the medium-voltage portfolio.
300 kVA, low voltage, and HVAC, two COFEPRIS operating rooms.
FINSA El Salto was a project of canalizations in Jalisco, not as Tijuana work. Multi IV Otañez was a project of office air conditioning, facade, and civil work.
Service area: all of Baja California (Tijuana, Rosarito, Tecate, Mexicali and Ensenada). Office: Nicolás Bravo 2936, Col. Colas del Matamoros, CP 22204, Tijuana, B.C.. Phone (664) 604-1810.
Process
Load data, CFE feasibility, civil works (pad, vaults, trenches), transformer and panels, UVIE verification when required, and CFE energization. Step-by-step guide: how to get CFE power for a new factory in Tijuana. Field work: medium voltage in Tijuana.
Service area: Tijuana, Rosarito, Tecate, Mexicali and Ensenada. 750 kVA transformer at Multi V Rosarito, 300 kVA at Clínica REYMAR.
Coverage and warranty
Office: Nicolás Bravo 2936, Col. Colas del Matamoros, Tijuana, B.C. 22204, Mexico. Since 2017. WhatsApp or phone (664) 604-1810, email [email protected]. Monday to Friday 8:00–17:00, Saturday 8:00–13:00 (Tijuana time).
FAQ
Quote
Luis Enrique Laija Pacheco, persona física