CFE substation for an industrial building in Tijuana

Alianza Electromecánica installs and commissions the medium-voltage substation of an industrial building in Tijuana, since 2017, and coordinates the work with CFE when the contract includes it. The scope covers the pad, manholes, transformer, switchgear and the documentation for review and energization.

Scope

What a CFE substation includes on site

In Tijuana, a plant's CFE substation is the medium-voltage work that receives utility power and delivers it at low voltage to panels and machinery. Alianza builds that work in the field: pad, trenches, duct bank, manholes, transformer setting, switching and the main switchboard.

When the contract includes it, we prepare the file, coordinate the UVIE review and support delivery to CFE for energization. Whether the arrangement is a pad-mounted transformer, a compact substation or another layout is defined by the project, the load and CFE requirements.

The general medium-voltage guide is in medium voltage in Tijuana. The utility steps are in how to get CFE power for a new factory.

Steps

From the site visit to energization

  1. Visit and survey of the building, the load and the connection point.
  2. Itemized proposal and definition of the substation type.
  3. Civil work for the pad, trenches and manholes.
  4. Installation, terminations, tests and documentation.
  5. CFE coordination and energization when the contract includes it.

Prepare

What helps us quote

The file often includes the single-line diagram.

FAQ

Frequently asked questions

What is a CFE substation for an industrial building?
It is the plant's medium-voltage substation, built to receive CFE supply and deliver power to the building's switchgear. Alianza installs that work and coordinates with CFE when the contract includes it.
Does Alianza handle the CFE paperwork?
When the scope includes it, we prepare the work and the file, coordinate the review and support delivery to CFE. The supply contract is signed by the client or the developer.
Can it be a compact substation or a pad-mounted transformer?
Yes. The type is defined by the project, the load and CFE requirements. We review it during the survey.
Do you maintain an existing substation?
Yes. Preventive and corrective maintenance is described on the electrical substations page.
How do I request a quote?
Write on WhatsApp to 664 604 1810 or to [email protected] with the building location and the load or kVA.

Quote

Tell us about the building and we will quote the substation

Send the location, the load or the kVA you have in mind and a drawing if you have one. WhatsApp 664 604 1810 or [email protected].

Alianza Electromecánica

Luis Enrique Laija Pacheco, persona física

📱
WhatsApp / Phone(664) 604-1810
📍
OfficeNicolás Bravo 2936, Col. Colas del Matamoros, CP 22204, Tijuana, B.C.
🕗
HoursMon–Fri 08:00–17:00 · Sat 08:00–13:00

Plant details

WhatsApp (664) 604-1810