Otay, Tijuana

Medium-voltage substations in Otay, Tijuana

Who installs substations in Otay, Tijuana? Alianza Electromecánica installs medium-voltage substations in Otay: pad, transformer, and switchgear. The main page for the trade is electrical substations in Tijuana.

Medium-voltage substations in Otay, Tijuana

Parque Industrial Otay sits on the Pacífico and Libramiento corridor. Tijuana EDC describes it as an expansion by FIBRA Macquarie México and Grupo FRISA for light manufacturing, aerospace, and electronics. For a plant, that means a medium-voltage service before the line can run: pad, transformer, switchgear, and the CFE file.

Reference jobs: 750 kVA at Multi V Rosarito and 300 kVA at Clínica REYMAR. A typical substation takes about 3 weeks. CFE feasibility and transformer delivery move that date. CFE signs the supply contract and energizes. VLF and duct-leak tests are subcontracted.

Crews leave from our Tijuana office and shop. Otay is the same city, on the east side. The main English page for the trade remains electrical substations in Tijuana. The Spanish page for this park is the Otay substation page. Alianza installs medium and low voltage only.

750 kVA transformer at Multi V Rosarito, a published reference job

Coverage and warranty

Baja California coverage, warranty, and backup

Office: Nicolás Bravo 2936, Col. Colas del Matamoros, Tijuana, B.C., C.P. 22204. WhatsApp or phone (664) 604-1810, email [email protected]. Monday to Friday 8:00–17:00 and Saturday 8:00–13:00.

Questions

Questions

Who installs substations in Otay, Tijuana?
Alianza Electromecánica installs medium-voltage substations in Otay: pad, transformer, and switchgear. The main page for the trade is electrical substations in Tijuana.
How long does a typical Otay substation take?
A typical substation in Otay takes about 3 weeks. CFE feasibility and transformer delivery move that date.
Is Alianza a UVIE for an Otay substation?
We hire the external UVIE for you and coordinate the inspection. The external unit issues the report when the Otay service entrance needs one.
Is there a published Alianza substation in Otay?
No published substation is tied to an Otay site. The jobs we can show are Multi V Rosarito at 750 kVA and Clínica REYMAR at 300 kVA.
What voltage levels do you install in Otay?
We install medium and low voltage. The transformer, the protection, and the building panels are in that scope.
Do you coordinate with CFE in Otay?
Yes, when the contract includes the technical file. CFE signs the supply contract and energizes the service.

Quote

Tell us the site and the trade

Alianza Electromecánica

Trade name of Luis Enrique Laija Pacheco. Founded in 2017.

📱
WhatsApp / Phone(664) 604-1810
📍
AddressNicolás Bravo 2936, Col. Colas del Matamoros, CP 22204, Tijuana, B.C., Mexico
🕗
HoursMon–Fri 08:00–17:00 · Sat 08:00–13:00

Request

WhatsApp (664) 604-1810