Who installs substations in Otay, Tijuana? Alianza Electromecánica installs medium-voltage substations in Otay: pad, transformer, and switchgear. The main page for the trade is electrical substations in Tijuana.
The zone
Parque Industrial Otay sits on the Pacífico and Libramiento corridor. Tijuana EDC describes it as an expansion by FIBRA Macquarie México and Grupo FRISA for light manufacturing, aerospace, and electronics. For a plant, that means a medium-voltage service before the line can run: pad, transformer, switchgear, and the CFE file.
Reference jobs: 750 kVA at Multi V Rosarito and 300 kVA at Clínica REYMAR. A typical substation takes about 3 weeks. CFE feasibility and transformer delivery move that date. CFE signs the supply contract and energizes. VLF and duct-leak tests are subcontracted.
Crews leave from our Tijuana office and shop. Otay is the same city, on the east side. The main English page for the trade remains electrical substations in Tijuana. The Spanish page for this park is the Otay substation page. Alianza installs medium and low voltage only.

Coverage and warranty
Office: Nicolás Bravo 2936, Col. Colas del Matamoros, Tijuana, B.C., C.P. 22204. WhatsApp or phone (664) 604-1810, email [email protected]. Monday to Friday 8:00–17:00 and Saturday 8:00–13:00.
Questions
Quote
Trade name of Luis Enrique Laija Pacheco. Founded in 2017.