Alianza measures the power factor of your plant in Tijuana, finds why it is off the operating value and proposes the correction. When needed, we install the capacitor bank, place it in service and issue the measurement report.
Scope
A low power factor means the plant draws more current than it turns into useful work. In Tijuana that shows up on the utility bill, in warm feeders and in switchgear that has little spare capacity. Alianza starts from an on-site measurement, not from a generic figure.
With that data we propose the correction: an operating adjustment, a capacitor bank or a combination. Supply and installation of the bank are covered in capacitor banks in Tijuana. If this is part of a broader study, we tie it to the Código de Red page.
Steps
Prepare
Thermography of the switchgear, if you want it on the same visit, is on industrial thermography in Tijuana.
FAQ
Quote
Share a recent utility bill or demand data and we will tell you how to start the measurement. WhatsApp 664 604 1810 or [email protected].
Luis Enrique Laija Pacheco, persona física